Projects

Masama Coal Project - Environmental Impact Assessment Study for the Proposed Open Pit Coal Mine

The aim of the proposed mine is to abstract shallow coal by means of an open cast mining method and to beneficiate the coal to export quality standard so that it can be consumed by both the local and regional markets.The coal resource allows for greater than a 20-year open cast life of mine.

Strategic Environmental Assessment for the Urban Design Master Plan Review and Landscape Design Master Plan for the Sir Seretse Khama International Airport Special Economic Zone

Royal Haskoning DHV has been appointed by Botswana Investment and Trade Centre (BITC), on behalf of the Special Economic Zones Authority (SEZA), to prepare an Urban Design and Landscape Design Masterplan for the Sir Seretse Khama International Airport Special Economic Zone (SSKIA-SEZ).In line with the Environmental Assessment (EA) Act (2011), SSI has commissioned Ecosurv Environmental...

ENRC 600MW Power Plant

ENRC (Botswana) (Pty) Ltd intends to build a mine-mouth coal fired power plant at the vicinity of the Morupule coal mine in Palapye, Botswana. The Power Plant will comprise of a 600 MW maximum capacity system. The power generated will be exported to Southern African Power Pool via the Botswana Power Corporation (BPC) electrical transmission grid.

Morupule B Phase 2 Units 5 & 6 300 MW coal fired power station

Government has determined that a 300 MW coal-fired power plant with a commercial operations date of 2018/2019 period would best meet projected power requirementsThe site for the power station lies within the existing BPC power complex at Phalapye and is approximately 7.5 km from Morupule Coal Mine; who will supply coal through a coal supply agreement. There is potential for sharing common...

Tlou Energy CBM Exploration and Abstraction ESIA

Tlou Energy (Pty) Ltd proposes to develop a Coalbed Methane (CBM) gas wellfield within the Western Sandveld ranches in the Central District about 75 km north west of Kodibeleng. The Proposed CBM gas wellfield development area will be located within PL 002/2004. The development facilities will include the installation of between 100-200 production pods consisting of horizontal and vertical...

Pages